A/C Replacement (PRAR)

1 & 2 Family, Multi-Family, and Commercial

Self Issuing Permit

This is a self-issuing permit available on the portal, unless any of the criteria listed below apply. If they do, the permit will follow the standard permitting and plan review process. Additional documentation may be needed, as outlined below:

  • Greater than 5 tons (single family)
  • Located on the roof of a building
  • Adding concrete slab
  • Changing size of equipment 
  • Moving location of equipment • Any changes to duct work
  • Adding a new mini-split
  • If owner-builder
  • In a trailer or manufactured home
  • If commercial building
  • If multi-family building
Submittal Requirements

The submittal items below must have documents submitted for review as required by the scope of work

Greater than 5 tons OR changing size of equipment OR commercial OR multi-family

Located on the roof of a building:

Adding concrete slab OR moving location of equipment:

Any changes to duct work:

Adding a new mini-split:

Work in a trailer or manufactured home:

If owner-builder:

  • Owner-Builder Application:(PDF, 4MB) For owners of property acting as their own contractor and providing direct, onsite supervision themselves of all work not performed by licensed contractors. The owner-builder application must be signed in person and notarized by Collier County Growth Management staff.

Information Required for Permit Application

The following questions will be asked on the portal when applying for a permit.

Select: Mechanical, Electrical, Plumbing, Gas & Fire Permits

Application Type

  • Choose the application type: AC Replacement
  • Please categorize the nature of the work being done: Alteration/Remodel
  • Please describe the work being done: (enter scope of work)
  • Building Use: 1-2 Family, Business, Institutional/Civic, Mixed-Use, Multi-Family, Transient Lodging
  • Is this a private provider inspection?
  • Is this a private provider review?
  • Is the property owner doing work?
  • Number of Tons: 1-2 Family and Multi-Family only
  • Is this external equipment being replaced due to flood damage? 1-2 Family and Multi-Family only
  • Changing size of original equipment? 1-2 Family and Multi-Family only
  • Moving location of equipment? 1-2 Family and Multi-Family only
  • Any duct work? 1-2 Family and Multi-Family only
  • Adding new mini-split? 1-2 Family and Multi-Family only
  • Is this for a Trailer or Mobile Home? 1-2 Family and Multi-Family only
  • Related to a Natural Disaster?
  • Waiver of review time limits:
  • Are you applying as a Design Professional?
  • Are you applying as a State Park, Habitat for Humanity, or Chickee Builder contact?

Permit Type

  • Mechanical

Work Items

  • Declared Construction Cost for this scope of work
  • Is declared value of work > 25% of structure's improved value?
  • Work Items (select as applicable): A/C Replacement – 1-2 Family/Comm, Like for Like, A/C Replacement – 1-2 Family/Comm, A/C Replacement – Mobile Home/Construction Trailer Location Address location: (enter street address or parcel)

Contacts

  • Select Primary Contractor: (only active contractors will show)
  • Select Qualifier: Select any subcontractors needed (electrical, plumbing, mechanical, roof, septic)