Awning (PRAW)

Submittal Requirements

The submittal items below must have documents submitted for review as required by the scope of work.

  • Specialty Engineering / Specification Sheets: Construction plans for awning, signed and sealed, if applicable. Information about fabric.
  • Site Planning Document: A copy of the approved site plan
Information Required for Online Portal Application

The following questions will be asked on the portal when applying for a permit.

Select: Building, Remodel & Accessory Permits
Application Type
  • Choose the application type: Awning
  • Please categorize the nature of the work being done: Addition, Alteration/Remodel, New Construction
  • Please describe the work being done: (enter scope of work)
  • Building Use: Business, Institutional/Civic, Mixed-Use, Multi-Family, Transient Lodging
  • Is this a private provider inspection?
  • Is this a private provider review?
  • Is the property owner doing work?
  • Business Name:
  • Related to a Natural Disaster?
  • Waiver of review time limits:
  • Are you applying as a Design Professional?
  • Are you applying as a State Park, Habitat for Humanity, or Chickee Builder contact?
Permit Type
  • Awnings
Work Items
  • Declared Construction Cost for this scope of work: Work Items (select as applicable): Awnings – Comm
Location
  • Address Location: (enter street address or parcel)
Contacts
  • Select Primary Contractor: (only active contractors will show)
  • Select Qualifier:
  • Select any subcontractors needed: electrical, plumbing, mechanical, roof, septic