1 & 2 Family Home - New (PRFH)
New Construction & Additions, including guest houses
For new construction, if the ROW is county-maintained, a right-of-way permit must be issued before the house permit can be issued.
Submittal Requirements
The submittal items below must have documents submitted for review as required by the scope of work. If applicable, plans must be signed and sealed.
- Architectural Plans
- Structural Plans
- Foundation plan, footing and columns detail
- Typical wall section
- Door and window schedule with egress requirements
- Door and window buck installation and flashing detail
- Wind load and design pressures
- Tie-beam and lintel layout and schedule
- Roof Framing Plan
- Accessible bathroom on the first floor
- Smoke and CO detector locations
- Attic vent calculations, if applicable
- Termite Contract, if applicable
-
AC Energy and Load Calculations: If any air-conditioned space: Energy and Load calculations specific to the scope of work.
-
Specialty Engineering/Specification Sheets: Truss layout and design loads by the manufacturer.
-
Site Planning Document: A proposed site plan. of changing any non-living space into living space. The plan shall identify: The location of the proposed building, the elevation of the crown of the road, Flood zone, FEMA's Base Flood Elevation, and proposed finish floor elevation.
This document may need to be certified if new impervious area is over 400 sq ft and not older than 6 months, signed and sealed by a licensed Florida professional surveyor and mapper, architect or engineer, showing property lines, setbacks, easements, water bodies, and all existing and proposed structures.
Index Sheet:(PDF, 312KB) List of Florida Product Approvals or Miami-Dade NOA numbers for all windows, doors, shutters, roofing materials, underlayment, roof vents, etc. · Filled out with all products used including decimal, for example: FL 15729.4 · Copies of Product Approvals and Miami-Dade NOAs not required
- If on septic: Please show distance of proposed structure to septic. Per 62-6.005(2) F.A.C., must be at least 5 feet away.
Additional Submittal Requirements
Additional submittal items and documents may be required based on information provided and scope of work.
-
Vegetation Removal Affidavit:(PDF, 126KB) Required if lot is one acre or greater.
-
One acre of vegetation is allowed to be removed after the single-family building permit has been issued. A Vegetation Removal Permit is required to clear over one acre.
-
Lots located in the Rural Agricultural (A) Zoning district outside the Immokalee Urban Area Overlay district and outside the coastal urban designated area as established in the Future Land Use Map;
-
Lots that have received a Surface Water Management or Environmental Resource Protection permit from the South Florida Water Management District.
-
Private Provider Package: Required if a Private Provider is performing inspections or plan review.
-
FEMA 50% documents: Projects that are considered substantial improvement must meet the current Florida Building Code, as well as the provisions of the Collier County Floodplain Management Ordinance. (additions only)
-
Preservation Review Form:(PDF, 559KB) If the property is in the Rural Fringe Mixed Use District.
-
DEP/Septic Application: Required when construction is proposed on a site with a septic field. Visit the Florida Department of Environmental Protection website for further information.
-
Owner-Builder Application:(PDF, 468KB) For owners of property when acting as their own contractor and providing direct, onsite supervision themselves of all work not performed by licensed contractors. Document must be signed in person and notarized by Collier County Growth Management staff.
Information Required for Permit Application
The following questions will be asked on the portal when applying for a permit.
Select: Building, Remodel & Accessory Permits
Application Type
- Choose the application type: 1-2 Family Home
- Please categorize the nature of the work being done: Addition, Alteration/Remodel, New Construction
- Please describe the work being done: (enter scope of work)
- Building Use: 1-2 Family
- Is this a private provider inspection?
- Is this a private provider review?
- Number of Stories?
- Is this application based on a preliminary plat to construct houses before plat recording, per F.S. 177.073?:
- Provide Preliminary Plat Reference Number, when applicable:
- Number of Bedrooms & Bathrooms
- Which story/floor working on?
- Is property owner doing work?
- Related to a Natural Disaster?
- Water disposal: Everglades City, Septic, or Sewer
- Water Utility Type: New or Existing
- Water Utility Provider: Ave Maria, Collier County, Everglades City, Immokalee, Port of the Islands, or Well
- Is the home in a residential subdivision?
- Waiver of review time limits:
- Are you applying as a Design Professional?
- Are you applying as a State Park, Habitat for Humanity, or Chickee Builder contact?
Permit Type
Work Items
- Declared Construction Cost for this scope of work
- Residential Living Area (includes multi-family)
- Residential Non-Living Area (includes multi-family)
- Work Items (select as applicable): 1-2 Family Home,New, Guest House, Modular Home, New
Location
- Address location: (enter street address or parcel)
Contacts
- Select Primary Contractor:(only active contractors will show)
- Select Qualifier: