Mechanical (PRHV)

1 & 2 Family, Multi-Family and Commercial

Submittal Requirements

The submittal items below must have documents submitted for review as required by the scope of work. If applicable, plans must be signed and sealed.

Mechanical Plans: Plans must reflect scope of work

Exhaust Hood System:

  • Kitchen floor plan and cooking equipment layout beneath the proposed exhaust hood.
  • Roof Plan that identifies anything within 10 ft. radius of the exhaust discharge. For wall terminations show everything within a 10ft. radius of the exhaust discharge both horizontally and vertically. For a sloped roof, identify the location and size of the platform to be used to provide a safe working surface for the cleaning and servicing of ducts.
  • Plans identifying the construction of any walls or ceilings with 18 inches of the hood and/or duct. If less than 18 inches, identify the distance, area, and the clearance reduction method to be used
  • Manufacturers Specification Sheets - manufacturers specification sheets for any fire wrap, access panel, doors, ceiling tiles, fans, etc.
  • Exhaust Duct plans identifying the length of the exhaust duct and all cleanout access panels.

Cooling Tower: Sealed Engineered drawings for units over 15 tons.

Refrigeration (Walk-in cooler, freezer, chiller): Plans showing layout of equipment. Sealed engineered drawings for units over 15 tons.

New mini-split: Plans showing location of installation. Energy and Load calculations specific to the scope of work.

Additional Submittal Requirements

Additional submittal items and documents may be required based on information provided and scope of work.

  • Site Planning Document: For cooling tower & refrigeration: Site plan showing size, location, setbacks and dimensions of the equipment.
  • Owner-Builder Application:(PDF, 4MB) For owners of property when acting as their own contractor and providing direct, onsite supervision themselves of all work not performed by licensed contractors. Document must be signed in person and notarized by Collier County Growth Management staff.


Information Required for Permit Application

The following questions will be asked on the portal when applying for a permit.

Select: Building, Mechanical, Electrical, Plumbing, Gas & Fire Permits

Application Type

  • Choose the application type: Accessory Structure
  • Please categorize the nature of the work being done: Alteration/Remodel
  • Please describe the work being done: (enter scope of work)
  • Building Use: 1-2 Family, Business, Institutional/Civic, Mixed-Use, Multi-Family, Transient Lodging
  • Is this a private provider inspection?
  • Is this a private provider review?
  • Is the property owner doing the work?
  • Business Name:
  • Related to a Natural Disaster?
  • Waiver of review time limits:
  • Are you applying as a Design Professional?
  • Are you applying as a State Park, Habitat for Humanity, or Chickee Builder contact?

Permit Type

  • Hoods or Mechanical

Work Items

  • Declared Construction Cost for this scope of work
  • Work Item:  (Select as Applicable) A/C Replacement, Mechanical Ventilation, Walk-in Cooler

Location

Address location: (enter street address or parcel)

Contacts

  • Select Primary Contractor:(only active contractors will show)
  • Select Qualifier:
  • Select any subcontractors needed (electrical, plumbing, mechanical, roof, septic)