Signs & Flagpoles (PRSG)

Chapter 4H of the Administrative Code

Submittal Requirements

The submittal items below must have documents submitted for review as required by the scope of work.

Sign Requirements

  • Sign Detail Affirmation:(PDF, 383KB) Complete with sign details, signed by the qualifier
  • Authorization Letter: Approval letter from the Property Owner or Management company, notarized.
  • Construction Plans:
  • For all sign types: Plans showing the method of attachments or engineering, color rendering of sign, dimensions of signage.
  • For Wall Signs, also include an elevation drawing showing:
  • Height and width of unit or building
  • Placement of sign on elevation
  • Ten percent clear area
  • Floor plan showing units and placement of where signs are to be attached

Site Planning Document:

  • For all sign types: A proposed site plan showing the location of the sign.
  • For Freestanding Signs, also include:
  • Placement of sign
  • Setbacks from sign to property lines
  • Road frontage dimensions

Flagpole Requirements

  • Construction Plans: Flagpole specifications and engineering, as required.
  • Site Planning Document: A proposed site plan showing placement of flagpole and setbacks   

Information Required for Permit Application

The following questions will be asked on the portal when applying for a permit.

Select:Right of Way, Sign & Wall Permit

Application Type

  • Choose the application type: Sign
  • Please categorize the nature of the work being done: Addition, Alteration/Remodel, New Construction
  • Please describe the work being done: (enter scope of work)
  • Building Use: 1-2 Family, Business, Institutional/Civic, Mixed-Use, Multi-Family, Transient Lodging
  • Is this a private provider inspection?
  • Is this a private provider review?
  • Is the property owner doing work?
  • Business name?
  • Change of Use
  • Waiver of review time limits:

Permit Type

  • Sign/Flapole

Work Items

  • Declared Construction Cost for this scope of work:
  • IWork Items (select as applicable): Sign, Flagpole

Location

  • Address location: (enter street address or parcel)

Contacts

  • Select Primary Contractor:(only active contractors will show)
  • Select Qualifier
  • Select and Subcontractors needed: (Electrical, Plumbing, Mechanical, Roof, Septic