Signs & Flagpoles (PRSG)
Chapter 4H of the Administrative Code
Submittal Requirements
The submittal items below must have documents submitted for review as required by the scope of work.
Sign Requirements
- Sign Detail Affirmation:(PDF, 383KB) Complete with sign details, signed by the qualifier
- Authorization Letter: Approval letter from the Property Owner or Management company, notarized.
- Construction Plans:
- For all sign types: Plans showing the method of attachments or engineering, color rendering of sign, dimensions of signage.
- For Wall Signs, also include an elevation drawing showing:
- Height and width of unit or building
- Placement of sign on elevation
- Ten percent clear area
- Floor plan showing units and placement of where signs are to be attached
Site Planning Document:
- For all sign types: A proposed site plan showing the location of the sign.
- For Freestanding Signs, also include:
- Placement of sign
- Setbacks from sign to property lines
- Road frontage dimensions
Flagpole Requirements
- Construction Plans: Flagpole specifications and engineering, as required.
- Site Planning Document: A proposed site plan showing placement of flagpole and setbacks
Information Required for Permit Application
The following questions will be asked on the portal when applying for a permit.
Select:Right of Way, Sign & Wall Permit
Application Type
- Choose the application type: Sign
- Please categorize the nature of the work being done: Addition, Alteration/Remodel, New Construction
- Please describe the work being done: (enter scope of work)
- Building Use: 1-2 Family, Business, Institutional/Civic, Mixed-Use, Multi-Family, Transient Lodging
- Is this a private provider inspection?
- Is this a private provider review?
- Is the property owner doing work?
- Business name?
- Change of Use
- Waiver of review time limits:
Permit Type
Work Items
- Declared Construction Cost for this scope of work:
- IWork Items (select as applicable): Sign, Flagpole
Location
- Address location: (enter street address or parcel)
Contacts
- Select Primary Contractor:(only active contractors will show)
- Select Qualifier
- Select and Subcontractors needed: (Electrical, Plumbing, Mechanical, Roof, Septic