Solar (PRSO)
1 & 2 Family, Multi-Family and Commercial
Submittal Requirements
The submittal items below must have documents submitted for review as required by the scope of work. If applicable, plans must be signed and sealed.
Site Planning Document: If ground-mounted: A proposed site plan.
- This document may need to be certified if new impervious area is over 400 sq ft and not older than 6 months, signed and sealed by a licensed Florida professional surveyor and mapper, architect or engineer, showing property lines, setbacks, easements, water bodies, and all existing and proposed structures.
- If on septic: Please show distance of proposed structure to septic. Per 62-6.005(2) F.A.C., must be at least 5 feet away.
Photovoltaic:
Construction Plans: Plans reflecting the scope of work, including:
- Certification of component listing and specifications and technical sheets for all equipment
- Riser diagram showing all wire sizes and types, junction boxes, and combiners
- Fastening details
- Structural load and wind load
- Location of equipment
Domestic Water Heater:
Construction Plans: Plans reflecting the scope of work, including:
- Certification of component listing and specifications and technical sheets for all equipment
- Thermal expansion detail
- Location of equipment, type, size and discharge of safety pan
- Fastening details
- Structural load and wind load
Pool Water Heater:
Construction Plans: Plans reflecting the scope of work, including:
Certification of component listing and specifications and technical sheets for all equipment
- Location of Panels
- Piping diagram
- Fastening details
- Structural load and wind load
Information Required for Permit Application
The following questions will be asked on the portal when applying for a permit.
Select: Building, Remodel & Accessory Permits
Application Type
- Choose the application type: Accessory Structure
- Please categorize the nature of the work being done: Alteration/Remodel, New Construction
- Please describe the work being done: (enter scope of work)
- Building Use: 1-2 Family, Business, Institutional/Civic, Mixed-Use, Multi-Family, Transient Lodging
- Is this a private provider inspection?
- Is this a private provider review?
- Is the property owner doing the work?
- Business Name:
- Related to a Natural Disaster?
- Waiver of review time limits:
- Are you applying as a Design Professional?
- Are you applying as a State Park, Habitat for Humanity, or Chickee Builder contact?
Permit Type
Work Items
- Declared Construction Cost for this scope of work
- Is declared value of work > 25% of structure's improved value?
- Work Item: (Select as Applicable) Solar work, Domestic Water System, Photovoltaic-Ground Mount Photovoltaic-Roof-Mount, Pool Water System
Location
- Address location: (enter street address or parcel)
Contacts
- Select Primary Contractor:(only active contractors will show)
- Select Qualifier:
- Select any subcontractors needed (electrical, plumbing, mechanical, roof, septic)