Development
FDEP Permit Application
REVISED FDEP Permit Applications should be sent to utilityplanning@collier.gov
Water - Construction of Water Main Extensions For PWS
North and South County Regional & Water Treatment Plants (PDF, 321KB)
Constructing a Domestic Wastewater Collection/Transmission System
North County Water Reclamation Facilities (NCWRF(PDF, 615KB))
South County Water Reclamation Facilities (SCWRF(PDF, 613KB))
Golden Gate Wastewater Treatment Plant (GGWWTP(PDF, 616KB))
Northeast Wastewater Treatment Plant (NEWWTP(PDF, 615KB))
Northeast Utility Water Reclamation Facilities - Interim (NECWRF(PDF, 617KB))
Calculator
Wastewater Flow Calculations(XLSX, 130KB) (Excel .xls format)
FDEP Preparation Guide
The guides are meant as an aid in preparing the FDEP forms and do not relieve the preparer of responsibility to provide complete and accurate information. The guides do not need to be submitted with the form.
Water Guide(PDF, 175KB)
Wastewater Guide(PDF, 171KB)
Requests
Request Utility Information
GIS Screenshots
To request GIS screenshots for approximate locations of existing utilities, please send an email request to UtilityPlanning@collier.gov.
Please note that GIS screenshots show approximate locations of existing utilities and should be used for reference or preliminary design only.
GIS Shapefiles
To request GIS shapefiles of Collier County Public Utilities GIS data, complete the GIS Data Request Form(PDF, 475KB) and email the request to Christopher.McGovern@collier.gov for processing.
Record Drawings
For more precise locations of existing utilities, you may request record drawings. For capital projects and existing infrastructure, please send a request to UtilityPlanning@collier.gov.
For record drawings of existing utilities in private subdivisions, please send a request to GMDRecordsRoom@collier.gov.
Request a Utility Pre-Submittal Meeting
Request Utility Deviation
To submit a Utility Deviation Request, click here(PDF, 123KB) to download the Utility Deviation Request Application Form (Appendix A of USM).
Please send completed application forms to UtilityPlanning@collier.gov. Upon receipt of your application, the PUEPMD team will review your request.
To request an optional pre-submittal deviation meeting, please email UtilityPlanning@collier.gov. These meetings are held on the second Thursday of each month via Webex. Pre-submittal time slots are 15 minutes each and begin at 2:00 pm.
Collier County Utilities Deviation Request submissions must meet all Collier County Code of Ordinances and other governmental requirements.
Please include key items for staff review in your application packet to streamline the administrative review process. These items vary based on the project. The items given the greatest weight generally include, but are not limited to: site constraints including why specific standards are impractical, engineering reports, demand calculations, alternative enhancements that provide equal or greater protection or reliability for the utility, and costs to maintain/operate conveyed assets.
Items that may not be considered as a basis for a deviation generally include but are not limited to: installation/construction costs, stated brand/developer preferences without technical support or site constraints, and that private assets do not carry a maintenance responsibility for the utility.